Your Position: Home > Blog

Winter Road Marking Paint: Key Application Considerations​​

Release Time:2025-07-31
Read:
Share:
Winter conditions pose unique challenges for road marking, requiring specialized materials and techniques to ensure durability and visibility.  Here are critical precautions for optimal results:

​​Surface Preparation​​
Ensure pavement is ​​completely dry​​ and free of snow/ice.  Use ​​hot-air lances or gas torches​​ to remove moisture, as residual water causes bubbling and adhesion failure.
​​Material Selection​​
​​Thermoplastic​​: Maintain temperature at ​​220°C​​ to prevent rapid cooling and poor glass bead adhesion.
​​MMA Resin​​: Ideal for sub-zero temperatures (-15°C to 35°C), curing in ​​10–30 minutes​​ with superior bonding strength.
​​Weather & Timing​​
Avoid施工during snowfall or below ​​5°C​​.  Opt for midday (11:00–16:00) when temperatures are highest.
​​Application Adjustments​​
Increase ​​glass bead dosage​​ (≥400g/m²) for wet-weather reflectivity.
Apply thinner layers (0.4–0.6mm) to prevent cracking from thermal contraction.
​​Post-Application Care​​
Protect fresh markings for ​​4–6 hours​​ of curing.  Inspect for bubbles or cracks, indicating moisture contamination.
​​Pro Tip​​: Use ​​fast-curing MMA resins​​ for critical timelines, reducing downtime by 80% compared to epoxy.
ONLINE SERVICE
Your Satisfaction Is Our Successe
If you are looking for related products or have any other questions please feel free to contact us.
You can also give us a message below , we will be enthusiastic for your service.
Contact Us